Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc

  • Audited Supplier
  • 8 yrs

Contact Supplier

Product Highlights

  • High Recovery Rate: Recovers 95% zinc ingots from zinc ash for reuse in zinc kettles.
  • Multi-Metal Recovery: Recovers free zinc, tin, lead, and aluminum granules from ash.
  • High Production Capacity: Processes 1 ton of zinc ash per day with a 1000 kg drum capacity.
  • Flexible Fuel Options: Operates on natural gas, liquefied petroleum gas, or oil.
  • Turnkey Project Support: Provides consultancy, engineering, and construction management services.
  • Environmental Compliance: Advanced protective system meets current environmental standards.
  • Cost Effective: Lower investment and production costs with short construction periods.
  • Durable Equipment: Quality reliable design with low maintenance and easy operation.

Product Images of Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc

Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc pictures & photos
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
  • Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
    Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc

Find Similar Products

Product Description

Zinc ash separator / zinc ash recovery furnace for regeneration zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc

The zinc recovery furnace can get 95% zinc ingot from zinc ash, and the zinc ingots can be reused in the Zinc kettle again. It can achieve much more benefit for the hot dip galvanizing lines.
Fuel: Nature gas; Liquefied Petroleum Gas, Oil

Parameters:
Size: 3200 x 2275 x 3050 mm
Main motor power: 7.5 KW
Voltage: Three-Phase Five Wires (3P+N+PE) 380 V, 50 HZ
Drum capacity: 1000 kg
Production capacity: 1 Ton per day 

Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc
Range of Application
The zinc ash recovery furnace can recover all free zinc granules from the zinc ash, and also be used to recover other free matels' granules, such as tin, lead and aluminum etc.

Remarks:
Zinc ash recovery furnace can separate free zinc solid zinc granules from zinc ash which produced by galvanizing temperature 
< 500ºC, but not separate the zinc oxide, the free zinc solid zinc granules with excessive iron ions and the zinc dross.

Advantages:

--- Lower investment and production cost
--- Short construction periods
--- Quality reliable and Durable equipment, complies with current environmental standard
--- Low maintenance and easy operation
--- High galvanizing quality
--- Advanced environment protective system
--- Flexibility designing to meet the customers' requirements

We offer industry-leading consultancy, engineering, project management, constructin management, regulatory compliance, and environmental expertise to our clients in the galvanizing industry who need to set up the plant on turnkey basis.

 Zinc Ash Separator / Zinc Ash Recovery Furnace for Regeneration Zinc

Contact 

Mobile no.: +86-13703117050   
 
Tel.:  +86-311- 89667533 
Fax.: +86-311-84752998
Add.: Xinzhaidian Industry Zone, Zhaoxian, Shijiazhuang City, Hebei Province.  051530
Hebei Annuo Automation Technology Co., Ltd.

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR246958". Items marked "verified" are certified.

Watch Video
Watch Video
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.
Hebei Annuo Automation Technology Co., Ltd.

About Our Factory & Business Background

Address
Xinzhaidian Industrial Zone, Shijiazhuang, Hebei, China
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, CIP
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
Tianjin port

Our Production Capability & Technical Expertise

Main Products
Hot DIP Galvanizing Plant, Zinc Coating Machine, Zinc Plating Line, Zinc Tank, Galvanizing Kettle, Zinc Ash Recovery Unit, Zinc Pump, Zinc Dross Grab, Liquid Zinc Holding Tank

Our Industry Experience & Global Business Record

Export Year
2016-09-18
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the recovery rate of the furnace?
The furnace can recover 95% zinc ingots from zinc ash.
What metals can be recovered?
It recovers free zinc granules and other metals like tin, lead, and aluminum.
What is the daily production capacity?
The production capacity is 1 ton per day.
What fuels can be used?
It supports natural gas, liquefied petroleum gas, and oil.
What is the drum capacity?
The drum capacity is 1000 kg.
Does it separate zinc oxide?
No, it separates free zinc solid granules but not zinc oxide.
What is the lead time for orders?
Peak season lead time is 1-3 months; off-season is one month.
What payment terms are accepted?
We accept LC and T/T payment terms.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now