High Quality Acid Mist Treatment Equipment / Galvanizing Line
Contact Supplier
Product Highlights
- Acid Mist Neutralization: Uses acid-base neutralization principle to adsorb acidic or alkaline impurities from exhaust gas.
- CE and ISO Certified: Equipment meets CE and ISO certification standards for quality and safety.
- PP Board Construction: Tower body constructed from durable PP board material for corrosion resistance.
- Emission Standard Compliance: Pollutants conform to GB16297-1996 and GB9078-1996 emission standards after treatment.
- Noise Minimization: Design minimizes noise during equipment operation for a quieter working environment.
- Easy Maintenance: Advanced technology ensures reliable quality and easy maintenance management.
- Multiple Collection Options: Offers Fully Enclosed Room, Side Suction, and Cover-type selection processes.
- Equipment Protection: Fully enclosed rooms protect sensitive equipment like pumps and sensors from fumes.
Product Attributes
- Customization
- Available
- Type
- Coating Production Line
- Coating
- Galvanized
- Model NO.
- HDG-A
- Substrate
- Steel
- Certification
- CE, ISO
- Condition
- New
- Specification
- customized
- Trademark
- Annuo
- Origin
- Hebei, China
- HS Code
- 85433000
- Production Capacity
- 200sets/Year
Product Images of High Quality Acid Mist Treatment Equipment / Galvanizing Line
Find Similar Products
Product Description
The acid mist scrubber system sucks the collected exhaust gas into the acid mist scrubbing tower and flows through the packed bed section (the gas/liquid contact reaction medium), so that the exhaust gas and the chemical liquid flowing on the surface of the filler are in full contact, and the exhaust gas is utilized. The principle of acid-base neutralization is to adsorb acidic or alkaline impurities contained in the exhaust gas. This achieves the purpose of clean air.
Structure
The tower body material: PP board
Component: - liquid tank
- the wind input section
- first and second spray section
- mist eliminator
- exhaust vent
General advantages
- Advanced technology and reliable quality
- Easy maintenance management
- After processing the acid mist meet the emission standard
- Reduce operating costs and energy consumption
- Minimize the noise when the equipment running
- Reasonable layout, considering the actual situation
Effect Analysis
After processing, the pollutants all conform to the emission standards of"Comprehensive Discharge Standard of Atmospheric Pollutants ( GB16297-1996)" and "Emission standard of air pollutants for industrial kiln and furnace(GB9078-1996)".
Selecting Process for Acid Mist Collection
1. Fully Enclosed Room (strongly recommend)--Pre-treatment workshop is closed, and the mist is collected and treated in it.
2. Side Suction--Add side suction ducts at both sides of the pickling tank to collect acid mist. Not suitable for the acid tank's width over 2000mm.
3. Cover-type--Add a cover above the pickling tank to collect the acid mist under the cover. Suitable for the acid tank's width over 2000mm.
Fully Enclosed Room
The automatic crane and other sensitive equipment such as pumps and sensors, are all protected to avoid vapour and acidic fumes. During regular operation, no person work inside the fully enclosed pickling area.


About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR246958". Items marked "" are certified.
Company Profile
Hebei Annuo is a global provider of Hot DIP Galvanizing Plant and Solutions, Specialty General HDG plant design and manufacture service. Hebei Annuo was founded in 1998, with more than 20 years experience in Galvanizing field, has built more than 30 complete Hot DIP galvanizing plants in China and abroad. We have got ISO9001 and CE Certificates. Our products have been favored by more and more clients with the professional design, excellent quality and considerate service.
Business Scope
General galvanizing plant for structural steel, lighting poles, scaffolds, road guardrail, etc.
Special galvanizing plant for small standard parts such as bolts and nuts.
Special galvanizing plant for tubes.
Our history
From humble beginnings designing and manufacturing furnace to complete Hot DIP galvanizing plant, Hebei Annuo has grown into a Chinese market leader in development, design and manufacture of Hot DIP galvanizing plant. Over the past 20 years, Hebei Annuo's experience and expertise has LED to critical enhancements for companies, industries and Chinese and worlds' infrastructure. Now we are poised to have an even bigger impact on the world in the decades ahead.
About Our Factory & Business Background
- Address
- Xinzhaidian Industrial Zone, Shijiazhuang, Hebei, China
- Terms of Payment
- LC, T/T
- International Commercial Terms(Incoterms)
- FOB, EXW, CFR, CIF, CIP
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- Tianjin port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2016-09-18
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is the working principle of the acid mist scrubber?
- The system sucks exhaust gas into a scrubbing tower where it contacts chemical liquid on a packed bed, using acid-base neutralization to adsorb impurities.
- Which emission standards does the equipment meet?
- After processing, pollutants conform to the Comprehensive Discharge Standard of Atmospheric Pollutants (GB16297-1996) and Emission standard of air pollutants for industrial kiln and furnace (GB9078-1996).
- What material is used for the tower body?
- The tower body is made of PP board material.
- What are the available selection processes for acid mist collection?
- Three options are available: Fully Enclosed Room (recommended), Side Suction (for tanks under 2000mm width), and Cover-type (for tanks over 2000mm width).
- How does the fully enclosed room protect equipment?
- It protects automatic cranes, pumps, and sensors from vapour and acidic fumes, and ensures no personnel work inside the pickling area during operation.
- What is the average lead time for this equipment?
- The lead time is 1-3 months during peak season and one month during the off-season.
- What are the accepted payment terms?
- Payment terms include LC and T/T.
- What certifications does the equipment hold?
- The equipment holds CE and ISO certifications.
Send your message to this supplier
People who viewed this also viewed
-
US$100,000.00-3,000,000.00 / Set
-
US$1,000.00 / Piece
-
US$100,000.00-3,000,000.00 / Set
-
US$10,000.00-200,000.00 / Piece
-
US$5,000.00-100,000.00 / Piece
-
US$5,000.00-100,000.00 / Piece
-
US$3,000.00-5,000.00 / Set
-
US$1,500.00 / Ton
-
US$150,000.00 / Set
-
US$150,000.00 / Set
Find Similar Products By Category
- Supplier Homepage
- Products
- Environmental Protection Equipment
- Acid Mist Collecting & Scrubbing Tower System
- High Quality Acid Mist Treatment Equipment / Galvanizing Line
Related Categories
Hot Searches
- Production Line Factories
- Tube Production Line Factories
- Cutting Production Line Factories
- Board Production Line Factories
- Hot Production Line
- Dip Line
- Hot Press Line
- Zinc Plating Line
- Dip Coating Equipment
- Production Line Trends
- Environmental Protection Equipment Bulkbuy