• Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
  • Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
  • Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
  • Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
  • Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
  • Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line

Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line

Type: Coating Production Line
Coating: Galvanized
Substrate: Steel
Certification: CE, ISO
Condition: New
Transport Package: Container
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
HDG-ZFEE-200
Specification
customized
Trademark
Annuo
Origin
Hebei, China
HS Code
84171000
Production Capacity
99 Sets/Year

Product Description

                                           Zinc Fume Extraction Enclosure
Material:Steel sheet and steel frame+ Cylinder, air compressor, etc
Operation Method:Automatic operation+ Manual operation
Matched Machinary:Galvanizing Zinc Kettle + Zinc Fume
Filtration equipment etc.
Usage:
Zinc fume is produced by the reaction of the galvanizing reagents with the zinc solution.It is eliminated by the zinc fume collection system.
Feature:

Select the suitable process for your zinc fume collection.

Side suction with slot (suitable for rack plating): the exhaust openings are on both sides of zinc kettle, zinc fume is collected to the bag filter by the induced draft fan, treated in the bag filter. (this method is not suitable for zinc kettle with width over 1.8 meters.)
End blowing - end suction (suitable for rack plating): install a blower on one side of the boiler, and install a recycling cover on the other side. The zinc fume is blown to the other end by the blower, then collected and disposed by the outside filter.(this method is not suitable for zinc kettle with length over 10 meters.)
Closed recycle cover
- Closed Top Cover: install a closed cover on the top of kettle, connect  with the bag filter by pipes. (suitable for pipes, section steel, angle steel and channel steel plating)
- Fixed full-closed housing: place a full closed housing above the kettle with doors on both ends, and lift doors on both sides, connect with the outside filter by air draft pipe.(suitable for L shape or circle production line)
- Fully enclosed movable suspension housing: suspend a closed housing with lift doors on both sides of the travelling crane.(suitable for traditional galvanizing line which the zinc kettle is very wide)
Components:
- Recovery system

- Incoming pipeline
- Zinc fume treatment equipment
- Zinc ash recycling part (ash hopper)
- Induced draft fan
- Exhaust part
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line
Zinc Fume Extraction Enclosure for Hot DIP Galvanizing Production Line


If need more details for hot dip galvanizing line, kindly please contact with me:
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
30000000 RMB
Plant Area
>2000 square meters