Full Enclosure Pre-Treatment Room for Hot DIP Galvanizing Plant
Product Details
| Customization: | Available |
|---|---|
| OEM: | Available |
| ODM: | Available |
Diamond Member Since 2019
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Importers and Exporters
High Repeat Buyers Choice
Patents Awarded
Production Process Visualization
The supplier has import and export rights
More than 50% of buyers repeatedly choose the supplier
The supplier had awarded %s patents, you can check the %arLink for more information
You can check the supplier's production workflow chart or main facilities in the %arLink
Sign In to see all verified strength labels (29)
Find Similar Products
Basic Info.
- Model NO.
- ANG-P003
- Certificate
- ISO, SGS
- Type
- H-Section Steel
- Standard
- GB
- Steel Type
- Carbon Structural Steel
- Forming
- Hot-Rolled Steel
- Connection Form
- Bolt Connection
- Member
- Steeltruss
- Type of Steel For Building Structure
- H-Section Steel
- Carbon Structural Steel
- Q235
- Residential Wall Structure
- Wallboard
- Application
- Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
- Transport Package
- Requested
- Specification
- Customized
- Trademark
- QiHong
- Origin
- China
- HS Code
- 7308400000
- Production Capacity
- 500 Sets/Year
Product Description
Full enclosure pre-treatment room for hot dip galvanizing plant

Pre-treatment enclosure room
Acid mist treatment and full enclosure of pre-treatment room
1. All tanks in the pre-treatment are placed and installed in the pits which are above the ground. Full enclosure is essential steel building, which prevent acid mist leakage outside, no any corrosive for other equipments outside.
2. The full enclosure building is made of exterior steel structure and internal PVC crust corrosion resistant plate. The special material (eg. glass cement) are used among the panels to keep the good sealing property. Acid resistant wood board are installed at the 2m height position of lfull enclosure lower part, mount the window with glass to monitor, Ensure the pre-treatment processing in the micro negative pressure condition and prevent acid mist leakage outside. Two pcs maintenace gallery are installed on the top side of pre-treatment room.
3. The monorial hoists which are used for galvanizing line are placed on the topside of sealed roof of pre-treatment room. Monorial hoists with special device can move and return direction through breaking rubber gap among the silicon sealing belts, it can prevent and alleviate the corrosion and readuce maintenance and examination of workload, so the maintenance cost will be save too much.
4. The operators working environment is always in safe and clean condition.
Advantage
1. The lowest rated motor power under the same capacity conditions, completely collection efficiency.
2. The damage probability of PP transport pipes is very small, because no pipes that can be damged.
3. Safe, no acid vapour
4. The recoverable cost for all equipments in working area is very low
5. The equipment overflows very little, even though no working during night and holidays, it can avoid the acid vapors overflow channel and corrode the equipment.
Performance characteristics:
1. Operating temperature is 10 ~100°C.
2. Strong corrosion resistance, convenient operation, long service life;
3. Light weight, easy to transport and install;
4. Simple and convenient to maintain.
5. Applicable Media: almost all of the inorganic medium and most organic solvents.
Hebei Annuo Automatic Technology Co., Ltd. offers industry-leading consultancy, engineering, project management, constructin management, regulatory compliance, and environmental expertise to our clients in the galvanizing industry who need to set up the plant on turnkey basis.

Pre-treatment enclosure room
- The pre-treatment enclosure is made by H-section steel, and welded with polyethylene sheet, that make the whole pre-treatment enclosure in good quality condition, eg. good strength, good sealing property;
- Good anti-aging property, life time is up to 5-10 years;
- Install PP slot in the foundation, easy to observe acid leakage.
Acid mist treatment and full enclosure of pre-treatment room
1. All tanks in the pre-treatment are placed and installed in the pits which are above the ground. Full enclosure is essential steel building, which prevent acid mist leakage outside, no any corrosive for other equipments outside.
2. The full enclosure building is made of exterior steel structure and internal PVC crust corrosion resistant plate. The special material (eg. glass cement) are used among the panels to keep the good sealing property. Acid resistant wood board are installed at the 2m height position of lfull enclosure lower part, mount the window with glass to monitor, Ensure the pre-treatment processing in the micro negative pressure condition and prevent acid mist leakage outside. Two pcs maintenace gallery are installed on the top side of pre-treatment room.
3. The monorial hoists which are used for galvanizing line are placed on the topside of sealed roof of pre-treatment room. Monorial hoists with special device can move and return direction through breaking rubber gap among the silicon sealing belts, it can prevent and alleviate the corrosion and readuce maintenance and examination of workload, so the maintenance cost will be save too much.
4. The operators working environment is always in safe and clean condition.
Advantage
1. The lowest rated motor power under the same capacity conditions, completely collection efficiency.
2. The damage probability of PP transport pipes is very small, because no pipes that can be damged.
3. Safe, no acid vapour
4. The recoverable cost for all equipments in working area is very low
5. The equipment overflows very little, even though no working during night and holidays, it can avoid the acid vapors overflow channel and corrode the equipment.
Performance characteristics:
1. Operating temperature is 10 ~100°C.
2. Strong corrosion resistance, convenient operation, long service life;
3. Light weight, easy to transport and install;
4. Simple and convenient to maintain.
5. Applicable Media: almost all of the inorganic medium and most organic solvents.
Hebei Annuo Automatic Technology Co., Ltd. offers industry-leading consultancy, engineering, project management, constructin management, regulatory compliance, and environmental expertise to our clients in the galvanizing industry who need to set up the plant on turnkey basis.
Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Environmental Protection Equipment
- Acid Mist Collecting & Scrubbing Tower System
- Full Enclosure Pre-Treatment Room for Hot DIP Galvanizing Plant
Related Categories
Hot Searches
More